Energy storage systems are an increasingly important component of the U.S. power system. As the grid transitions away from traditional fossil fuels towards intermittent renewable resources, energy storage becomes an important asset for energy management, in order to maintain grid reliability and price certainty, and to ensure continued supplies of power through peak demand periods.

States can establish energy storage procurement targets to jump-start the development of energy storage systems. These targets set a required amount of energy storage, typically expressed in megawatts (MW), that must be developed or procured by a certain date. States often set interim targets to gradually build out their energy storage systems over time, including periodic reviews of progress.

State-determined energy storage targets are beneficial in that they provide supportive signals for investors and reduce regulatory uncertainty. Procurement targets can also vary from broad megawatt requirements to more specific mandates that focus on the adoption of certain storage technologies. Procurement targets can be established by the legislature or public utility commissions.

States with Policy Enacted

In Progress

Partially Enacted

See States List

Key Resources

Table of State Energy Storage Targets and Progress

A table of all existing state energy storage procurement mandates, targets, and goals, as well as progress to date.

Policy Explainer: How Energy Storage Policies can Allow Grids to Run on Renewables

A policy explainer that explores how energy storage policies play a pivotal role in facilitating the transition to clean energy, with insights into effective policy frameworks for maximizing the integration of renewable resources into grid operations.
2022
Source:

BATRIES Toolkit and Guidance for the Interconnection of Energy Storage and Solar-Plus-Storage

A toolkit that offers comprehensive solutions to eight key barriers hindering the integration of energy storage systems into the grid, and provides essential resources and guidance for policymakers and industry experts to ensure safer, more cost-effective, and efficient grid integration of storage technologies.

Energy Storage for a Modern Electric Grid: Technology Trends and State Policy Options

A policy primer exploring how energy storage technologies work, the benefits that storage can deliver to the electric grid, the current legal and regulatory barriers to adoption, and policy options for addressing those obstacles.

Model States

California

1,385 megawatts (MW) of storage by 2020, of which 500 MW must be distributed storage, and 15 gigawatts (GW) of storage and demand response by 2032

Maryland

750 megawatts (MW) of storage capacity by 2027, 1,500 MW by 2030, and 3,000 MW by 2033

HB 1035 requires the procurement of up 1.75 GW of battery storage

2023
Establishing Policies

Michigan

2,500 megawatts (MW) of energy storage capacity by 2030

2023
Establishing Policies

New York

1,500 megawatts (MW) of energy storage by 2025 and 6,000 MW by 2030

Energy Storage Targets By State

Filters
Status State Sort descending Region Components Year Enacted
Not Enacted
Empty column

Energy storage targets establish procurement targets for energy storage systems by a certain date, often with interim targets. Targets can vary from broad megawatt (MW) requirements to more specific mandates that focus on the adoption of certain storage technologies.

Empty column
Southeast
Not Enacted
Empty column

Energy storage targets establish procurement targets for energy storage systems by a certain date, often with interim targets. Targets can vary from broad megawatt (MW) requirements to more specific mandates that focus on the adoption of certain storage technologies.

Empty column
West
Not Enacted
Empty column

Energy storage targets establish procurement targets for energy storage systems by a certain date, often with interim targets. Targets can vary from broad megawatt (MW) requirements to more specific mandates that focus on the adoption of certain storage technologies.

Empty column
Southwest
Not Enacted
Empty column

Energy storage targets establish procurement targets for energy storage systems by a certain date, often with interim targets. Targets can vary from broad megawatt (MW) requirements to more specific mandates that focus on the adoption of certain storage technologies.

Empty column
Southeast
Enacted
Empty column

1,385 megawatts (MW) of storage by 2020, of which 500 MW must be distributed storage, and 15 gigawatts (GW) of storage and demand response by 2032

Empty column
West 2021
Not Enacted
Empty column

Energy storage targets establish procurement targets for energy storage systems by a certain date, often with interim targets. Targets can vary from broad megawatt (MW) requirements to more specific mandates that focus on the adoption of certain storage technologies.

Empty column
West
Enacted
Empty column

300 megawatts (MW) of energy storage by 2024, 650 MW by 2027, and 1,000 MW by December 31, 2030

Establishing Policies
Empty column
Northeast 2021
In-Progress
Empty column

The 2026 Value of Battery Storage Report, required by SJR 3 (2025), evaluates the costs, benefits, and opporunities of accelerated battery storage deployment in Delaware over a 2027-2036 period. The study is intended to inform statewide battery storage targets.

Empty column
Southeast 2025
Not Enacted
Empty column

Energy storage targets establish procurement targets for energy storage systems by a certain date, often with interim targets. Targets can vary from broad megawatt (MW) requirements to more specific mandates that focus on the adoption of certain storage technologies.

Empty column
Southeast
Not Enacted
Empty column

Energy storage targets establish procurement targets for energy storage systems by a certain date, often with interim targets. Targets can vary from broad megawatt (MW) requirements to more specific mandates that focus on the adoption of certain storage technologies.

Empty column
Southeast
Not Enacted
Empty column

Energy storage targets establish procurement targets for energy storage systems by a certain date, often with interim targets. Targets can vary from broad megawatt (MW) requirements to more specific mandates that focus on the adoption of certain storage technologies.

Empty column
West
Not Enacted
Empty column

Energy storage targets establish procurement targets for energy storage systems by a certain date, often with interim targets. Targets can vary from broad megawatt (MW) requirements to more specific mandates that focus on the adoption of certain storage technologies.

Empty column
West
Enacted Midwest 2026
Not Enacted
Empty column

Energy storage targets establish procurement targets for energy storage systems by a certain date, often with interim targets. Targets can vary from broad megawatt (MW) requirements to more specific mandates that focus on the adoption of certain storage technologies.

Empty column
Midwest
Not Enacted
Empty column

Energy storage targets establish procurement targets for energy storage systems by a certain date, often with interim targets. Targets can vary from broad megawatt (MW) requirements to more specific mandates that focus on the adoption of certain storage technologies.

Empty column
Midwest
Not Enacted
Empty column

Energy storage targets establish procurement targets for energy storage systems by a certain date, often with interim targets. Targets can vary from broad megawatt (MW) requirements to more specific mandates that focus on the adoption of certain storage technologies.

Empty column
Midwest
Not Enacted
Empty column

Energy storage targets establish procurement targets for energy storage systems by a certain date, often with interim targets. Targets can vary from broad megawatt (MW) requirements to more specific mandates that focus on the adoption of certain storage technologies.

Empty column
Southeast
Not Enacted
Empty column

Energy storage targets establish procurement targets for energy storage systems by a certain date, often with interim targets. Targets can vary from broad megawatt (MW) requirements to more specific mandates that focus on the adoption of certain storage technologies.

Empty column
Southeast
Enacted
Empty column

300 megawatts (MW) of energy storage by 2025 and 400 MW by December 31, 2030

Establishing Policies
Empty column
Northeast 2021
Enacted
Empty column

750 megawatts (MW) of storage capacity by 2027, 1,500 MW by 2030, and 3,000 MW by 2033

HB 1035 requires the procurement of up 1.75 GW of battery storage

Establishing Policies
Empty column
Southeast 2023
Enacted
Empty column

200 megawatts (MW) of storage capacity by 2020, 1,000 megawatt-hours (MWh) by 2025, and 5,000 MWh by 2030

Empty column
Northeast 2024
Enacted
Empty column

2,500 megawatts (MW) of energy storage capacity by 2030

Establishing Policies
Empty column
Midwest 2023
Not Enacted
Empty column

Energy storage targets establish procurement targets for energy storage systems by a certain date, often with interim targets. Targets can vary from broad megawatt (MW) requirements to more specific mandates that focus on the adoption of certain storage technologies.

Empty column
Midwest
Not Enacted
Empty column

Energy storage targets establish procurement targets for energy storage systems by a certain date, often with interim targets. Targets can vary from broad megawatt (MW) requirements to more specific mandates that focus on the adoption of certain storage technologies.

Empty column
Southeast
Not Enacted
Empty column

Energy storage targets establish procurement targets for energy storage systems by a certain date, often with interim targets. Targets can vary from broad megawatt (MW) requirements to more specific mandates that focus on the adoption of certain storage technologies.

Empty column
Midwest
Not Enacted
Empty column

Energy storage targets establish procurement targets for energy storage systems by a certain date, often with interim targets. Targets can vary from broad megawatt (MW) requirements to more specific mandates that focus on the adoption of certain storage technologies.

Empty column
West
Not Enacted
Empty column

Energy storage targets establish procurement targets for energy storage systems by a certain date, often with interim targets. Targets can vary from broad megawatt (MW) requirements to more specific mandates that focus on the adoption of certain storage technologies.

Empty column
Midwest
Enacted
Empty column

100 megawatts (MW) of energy storage by 2021 and 1,000 MW by 2030

Establishing Policies
Empty column
West 2020
Not Enacted
Empty column

Energy storage targets establish procurement targets for energy storage systems by a certain date, often with interim targets. Targets can vary from broad megawatt (MW) requirements to more specific mandates that focus on the adoption of certain storage technologies.

Empty column
Northeast
Enacted
Empty column

600 megawatts (MW) of energy storage by 2021 and 2,000 MW by 2030

Establishing Policies
Empty column
Northeast 2018
Not Enacted
Empty column

Energy storage targets establish procurement targets for energy storage systems by a certain date, often with interim targets. Targets can vary from broad megawatt (MW) requirements to more specific mandates that focus on the adoption of certain storage technologies.

Empty column
Southwest
Enacted
Empty column

1,500 megawatts (MW) of energy storage by 2025 and 6,000 MW by 2030

Empty column
Northeast 2024
Not Enacted
Empty column

Energy storage targets establish procurement targets for energy storage systems by a certain date, often with interim targets. Targets can vary from broad megawatt (MW) requirements to more specific mandates that focus on the adoption of certain storage technologies.

Empty column
Southeast
Not Enacted
Empty column

Energy storage targets establish procurement targets for energy storage systems by a certain date, often with interim targets. Targets can vary from broad megawatt (MW) requirements to more specific mandates that focus on the adoption of certain storage technologies.

Empty column
Midwest
Not Enacted
Empty column

Energy storage targets establish procurement targets for energy storage systems by a certain date, often with interim targets. Targets can vary from broad megawatt (MW) requirements to more specific mandates that focus on the adoption of certain storage technologies.

Empty column
Midwest
Not Enacted
Empty column

Energy storage targets establish procurement targets for energy storage systems by a certain date, often with interim targets. Targets can vary from broad megawatt (MW) requirements to more specific mandates that focus on the adoption of certain storage technologies.

Empty column
Southwest
Enacted
Empty column

At least 5 megawatt hours (MWh) of electricity from energy storage annually by 2020 from the state's two largest investor-owned utilities, up to 1% of 2014 peak load maximum

Establishing Policies
Empty column
West 2015
Not Enacted
Empty column

Energy storage targets establish procurement targets for energy storage systems by a certain date, often with interim targets. Targets can vary from broad megawatt (MW) requirements to more specific mandates that focus on the adoption of certain storage technologies.

Empty column
Northeast
Enacted
Empty column

90 megawatts (MW) of energy storage by 2026, 195 MW by 2028 and 600 MW by 2033

Establishing Policies
Empty column
Northeast 2024
Not Enacted
Empty column

Energy storage targets establish procurement targets for energy storage systems by a certain date, often with interim targets. Targets can vary from broad megawatt (MW) requirements to more specific mandates that focus on the adoption of certain storage technologies.

Empty column
Southeast
Not Enacted
Empty column

Energy storage targets establish procurement targets for energy storage systems by a certain date, often with interim targets. Targets can vary from broad megawatt (MW) requirements to more specific mandates that focus on the adoption of certain storage technologies.

Empty column
Midwest
Not Enacted
Empty column

Energy storage targets establish procurement targets for energy storage systems by a certain date, often with interim targets. Targets can vary from broad megawatt (MW) requirements to more specific mandates that focus on the adoption of certain storage technologies.

Empty column
Southeast
Not Enacted
Empty column

Energy storage targets establish procurement targets for energy storage systems by a certain date, often with interim targets. Targets can vary from broad megawatt (MW) requirements to more specific mandates that focus on the adoption of certain storage technologies.

Empty column
Southwest
Not Enacted
Empty column

Energy storage targets establish procurement targets for energy storage systems by a certain date, often with interim targets. Targets can vary from broad megawatt (MW) requirements to more specific mandates that focus on the adoption of certain storage technologies.

Empty column
West
Not Enacted
Empty column

Energy storage targets establish procurement targets for energy storage systems by a certain date, often with interim targets. Targets can vary from broad megawatt (MW) requirements to more specific mandates that focus on the adoption of certain storage technologies.

Empty column
Northeast
Enacted
Empty column

Appalachian Power: 260 megawatts (MW) of long-duration storage by 2035, 780 MW of short-duration storage by 2040, 520 MW of long-duration storage by 2045

Dominion Energy: 4 gigawatts (GW) of short-duration storage by 2030, 2GW of long-duration storage by 2035, and 16 GW of short-duration and 4GW long-duration capacity by 2045. 10% of projects must be deployed behind the meter, and 35% of capacity must be owned by non-utility entities.

Establishing Policies
Empty column
Southeast 2026
Not Enacted
Empty column

Energy storage targets establish procurement targets for energy storage systems by a certain date, often with interim targets. Targets can vary from broad megawatt (MW) requirements to more specific mandates that focus on the adoption of certain storage technologies.

Empty column
West
Not Enacted
Empty column

Energy storage targets establish procurement targets for energy storage systems by a certain date, often with interim targets. Targets can vary from broad megawatt (MW) requirements to more specific mandates that focus on the adoption of certain storage technologies.

Empty column
Southeast
Not Enacted
Empty column

Energy storage targets establish procurement targets for energy storage systems by a certain date, often with interim targets. Targets can vary from broad megawatt (MW) requirements to more specific mandates that focus on the adoption of certain storage technologies.

Empty column
Midwest
Not Enacted
Empty column

Energy storage targets establish procurement targets for energy storage systems by a certain date, often with interim targets. Targets can vary from broad megawatt (MW) requirements to more specific mandates that focus on the adoption of certain storage technologies.

Empty column
West

The State Climate Policy Dashboard tracks only passed policies and does not include bills currently proposed in legislative sessions. The website is intended to illustrate the current status of policies for each state, as well as key resources and model states for each policy.

Much of the information contained in this database is derived from the public domain, with links to resources provided. The information provided is made available solely for general information purposes and does not constitute legal advice. Click here for full Terms of Use.

Report an issue
See something we’re missing or a needed correction in our data?